West Goshen puts its answer in writing: no use and occupancy permit for a residential resale, a rule confirmed in the township FAQ and the fee schedule alike. A resale ordinance was drafted in 2021 and never became law. The result is the largest West Chester suburb with no municipal gate before settlement, which moves all the preparation to the seller.
The West Goshen picture
The township surrounds West Chester borough on three sides, carrying the school district and the restaurant scene without borough parking. Housing runs from postwar ranches to 1990s colonials and newer carriage homes along Route 202, and the buyer pool is deep enough that well-prepared listings move quickly in every season.
No resale permit, in writing
The township FAQ states that no new use and occupancy permit is required to sell an existing home, and the fee schedule limits U&O permits to new construction. Settlement still wants the routine paper: sewer, trash, and real estate tax certifications, ordered from the township and tax collector by your title company.
What preparation looks like
- Pull the permit file. The code department at 610-696-5266 can produce your property’s history. Decades of decks and finished basements live in that file, and the buyer’s attorney will read it even though the township never forces the question.
- Order certifications early. Sewer, trash, and tax certifications are routine but not instant; ordering in listing week keeps the settlement table clear.
- Mind the rental file. Tenant-occupied homes carry an annual rental license and biennial inspections; selling one means reconciling that record first.
The Pennsylvania money
West Goshen sits at the standard 2% total realty transfer tax, customarily split, so the seller’s half on a $600,000 sale is $6,000. Pennsylvania withholds nothing at settlement, and the federal exclusion, $250,000 single and $500,000 married, covers most owner-occupants. The home-sale tax guide and the cost-to-sell guide carry the detail.
Getting started
The West Goshen order: a free valuation, the township confirmed against the parcel, the permit file pulled and reconciled, and the certifications ordered early. The Chester County downsizing guide maps the county’s options, and the sequencing guide settles what to do first.